External display for 4...20 mA/HART sensors, without external power supply, panel mounting

Application
External display and adjustment module for panel mounting without external power. VEGADIS 176 is an external display and adjustment module without additional external power. It is used for standalone measured value indication in all standard 4…20 mA circuits. Your benefits: universal via a backlit, five-digit, scalable 17 mm display; reliable function and a wide range of application possibilities thanks to a compact, rugged housing with high protection rating in the front area; the low voltage drop of <1 V permits use in most 4…20 mA circuits. Technical data: digital voltage drop: <1 V; signal: 4…20 mA; installation: panel mounting.
Your benefit
Compact, rugged housing and high protection rating ensure reliable function and a wide range of applications
Universal via a 5-digit backlit, scalable 17 mm display
The low voltage drop of <1 V permits use in most 4…20 mA circuits

Municipal Wastewater Treatment

Municipal Wastewater Treatment — Wastewater Treatment Plant · Process Measuring and Control Instrument Application Case

Project Background

Municipal Wastewater Treatment customers at the Wastewater Treatment Plant stage have long faced the challenge of insufficient accuracy in effluent quality monitoring and instruments prone to contamination causing data drift, affecting compliance discharge, placing higher demands on the stability and measurement accuracy of Process Measuring and Control Instrument.

Solution

Based on the on-site conditions, the Ainstru technical team selected suitable Process Measuring and Control Instrument for the customer and delivered one-stop service covering selection, installation, commissioning and tuning.

Results

  • Measurement accuracy and response speed significantly improved, with stable and reliable data;
  • Instruments adapt to complex Municipal Wastewater Treatment conditions, greatly reducing maintenance;
  • Helping customers achieve continuous online monitoring and cost reduction, highly recognized by customers.
Food & Beverage

Food & Beverage — Food Production Line · Process Measuring and Control Instrument Application Case

Project Background

Food & Beverage customers at the Food Production Line stage have long faced the challenge of high hygienic measurement requirements, with inline instruments needing to withstand CIP/SIP cleaning while maintaining stable accuracy, placing higher demands on the stability and measurement accuracy of Process Measuring and Control Instrument.

Solution

Based on the on-site conditions, the Ainstru technical team selected suitable Process Measuring and Control Instrument for the customer and delivered one-stop service covering selection, installation, commissioning and tuning.

Results

  • Measurement accuracy and response speed significantly improved, with stable and reliable data;
  • Instruments adapt to complex Food & Beverage conditions, greatly reducing maintenance;
  • Helping customers achieve continuous online monitoring and cost reduction, highly recognized by customers.
Chemical & Pharmaceutical

Chemical & Pharmaceutical — Reactors and Storage Tanks · Process Measuring and Control Instrument Application Case

Project Background

Chemical & Pharmaceutical customers at the Reactors and Storage Tanks stage have long faced the challenge of highly corrosive media and complex conditions, requiring corrosion-resistant and explosion-proof instruments, placing higher demands on the stability and measurement accuracy of Process Measuring and Control Instrument.

Solution

Based on the on-site conditions, the Ainstru technical team selected suitable Process Measuring and Control Instrument for the customer and delivered one-stop service covering selection, installation, commissioning and tuning.

Results

  • Measurement accuracy and response speed significantly improved, with stable and reliable data;
  • Instruments adapt to complex Chemical & Pharmaceutical conditions, greatly reducing maintenance;
  • Helping customers achieve continuous online monitoring and cost reduction, highly recognized by customers.
Power & Energy

Power & Energy — Power Plant Boiler and Turbine · Process Measuring and Control Instrument Application Case

Project Background

Power & Energy customers at the Power Plant Boiler and Turbine stage have long faced the challenge of unstable measurement under high temperature and pressure, with high maintenance and downtime costs, placing higher demands on the stability and measurement accuracy of Process Measuring and Control Instrument.

Solution

Based on the on-site conditions, the Ainstru technical team selected suitable Process Measuring and Control Instrument for the customer and delivered one-stop service covering selection, installation, commissioning and tuning.

Results

  • Measurement accuracy and response speed significantly improved, with stable and reliable data;
  • Instruments adapt to complex Power & Energy conditions, greatly reducing maintenance;
  • Helping customers achieve continuous online monitoring and cost reduction, highly recognized by customers.