I. Installation Precautions
1. Probe Installation Requirements
- Position selection: Do not install in the feed area to avoid interference from medium impact.
- The distance between the probe and the container wall must be ≥50 mm, and the distance from the container bottom must be ≥10 mm to avoid capacitance interference.
- In stirred tanks, maintain a safe distance from the agitator to avoid mechanical damage.
- When lateral loads exist, a rod probe with a grounding tube must be used (Figure 4.2.1).

- Support device (mandatory when length >1 m):
- Fully insulated probes can be mounted on conductive/non-conductive supports; partially insulated probes require insulation of the uninsulated end.
- Support spacing: the lowest support is 300 mm from the probe end, and intermediate support spacing is L/2 (Figure 4.2.2).

2. Process Connection and Sealing
- Threaded installation (G½/G¾/G1/G1½):
- Use elastic fiber sealing rings (chemical resistant), and torque must be controlled according to specifications (e.g., G½ ≤80 Nm).
- Taper threads (NPT) require conductive sealing material to avoid insulation interference.
- Flange/clamp installation:
- Sealing rings must withstand process temperature and pressure (PTFE-lined flanges require spring washers).
- Regularly check screw tightness (recommended torque 60–100 Nm).

3. Housing Adjustment and Sealing
- Housing rotation: It can be rotated 270° according to the cable entry position. For outdoor installation, the cable must be bent downward and secured with cable ties (waterproof).

- Sealing protection:
- Do not use mineral oil-based grease on O-rings (damages the seal).
- After installation, confirm that the protective cover and cable gland are fully sealed (waterproof and dustproof).
4. Special Working Condition Handling
- Non-conductive media (conductivity <1 μS/cm):
- A grounding tube must be used, and the minimum probe length is calculated according to the formula (see Section 4.4).
- Separate housing:
- The cable length between the probe and the housing must be ≤6 m. When routed through a wall, it must be isolated from the process connection.
- When installing the wall mounting bracket, it must be pre-positioned as a drilling template (Figure 4.5.2).

II. Wiring Precautions
1. Safety Preparation
- Pre-power inspection:
- The supply voltage must match the nameplate (12–36 VDC in non-hazardous areas, 12–30 VDC in intrinsically safe areas).
- Disconnect power before operation. In hazardous areas, the Safety Guide (XA document) must be observed.
2. Equipotential and Grounding
- Equipotential connection:
- The cable shield on the sensor side must be grounded at one end (for hazardous areas).
- The housing grounding terminal (T13/F13, etc.) must be reliably connected to the plant grounding system (Figure 5.1.1).
- Cable specifications:
- Use shielded instrument cable (cross-section 0.5–2.5 mm²).
- When equipotential bonding is implemented, the shield can be grounded at both ends to optimize immunity (EMC compliant with NAMUR NE21).
3. Terminal Assignment and Connection
- Two-wire wiring:
- Terminal assignment: brown wire (+), blue wire (–) (Figure 5.2.2).
- HART communication requires an external 250Ω resistor (if not integrated in the power supply unit).
- M12 connector: Wiring can be done without opening the cover (Figure 5.1.4).
4. Special Requirements for Hazardous Areas
- Cable gland selection: Only specified explosion-proof cable glands may be used (see Section 5.1).
- Post-wiring inspection:
- Confirm that the terminal sequence is correct.
- The cable gland is properly sealed, and the housing protective cover is fully tightened.
- After power-on, a flashing green LED indicates normal operation.
III. Key Points Related to Commissioning and Maintenance
- Calibration prerequisites: When the medium conductivity is <100 μS/cm, the tank wall distance is <250 mm, or a custom range is required, recalibration is mandatory (Section 7.3).
- Functional safety test (Position 6): After startup, a 4–22 mA ramp signal is output (about 40 seconds), and coordination with the process side is required (Section 7.2.8).
- Maintenance warning: For explosion-proof instruments, only original spare parts are allowed. After repair, the calibration values must be transmitted via the DAT module (Section 10.3).